TK Concrete of Pella has substantially completed work on the E 12th St S (100-block) Sidewalk Improvements Project. The project consisted of the construction of new sidewalks and curb. In addition, three large driveway approaches were removed and replaced with two smaller driveway approaches. This change meets current standards. A storm sewer cover was replaced as part of this project. Seeding and erosion control are yet to be completed.